Beech Road Improvements Project


Project Description

The project will connect and enhance the segmented Beech Road corridor between Alderwood Mall Parkway (AMP) and Maple Road. The improvements will provide additional capacity in and around the highly congested Alderwood Mall area and provide improved access to the adjacent properties. As part of the project, a portion of existing Beech Road will be realigned through a proposed private redevelopment project located at 18631 Alderwood Mall Parkway and connected to an existing signalized intersection at Alderwood Mall Parkway and Alderwood Mall (Sears) entrance.


Project Phase

90% design and right-of-way acquisition currently in progress.


Project Manager

Erin Duleba, EIT
Project Manager
EDuleba@lynnwoodwa.gov
425-670-5227


Documents

Aerial 1
Aerial 2
Contours
Picture 1
Picture 2
Picture 3
Picture 4
Picture 5
Sewer 
Storm
Water


Links to Other Projects

 


How Can You Be Involved?

Check back for information on future Open House events.

information updated 7/15/2019