Amendments

 Spec or Std#      
 Edit Date
  Action
 TESC Notes  1/18/2024  Temporary Erosion and Sedimentation Control Notes: Item 11 should say 2 days between October 1 and April 30th or 7 days between May 1st and September 30th

 U-SEW-1,U-STO-7

 3/25/2024 Used East Jordan's CAD files to update both drawings. Added EJ model numbers. Added "locking lids".
 U-WAT-17  4/8/2024  Created new spec based off of Koraleen Water Sampling Station.
 ST-CG-3  5/23/2024  Renamed, removed anchors, reference dimensions with WSDOT standards.
 U-STO-10  5/23/2024  Modified standard to be the complete Hood, Frame and Grate rather than Hood only. Renamed appropriately.
 ST-CG-2 6/6/2024  Renamed, removed anchors, reference dimensions with WSDOT standards.
 F-1  6/7/2024 Cleaned references, notes and languages. Changed approved products. Added IFC note. Combined Some notes for clarity.
 U-STO-5 6/7/2024 Updated product number and changed to a "drain" lid.